Wastewater Systems
Wastewater Systems
The sewage in Gagetown is collected by our system and flows by gravity or is pumped to the sewer lagoon. Sewage is treated within our wastewater treatment plant where solids settle to the bottom while air is pumped into the pond (aeration).
The discharged water is tested weekly by our staff and monthly by an accredited lab who also reports to the Department of Environment.
Paying Your Sewer Bill
Payments can be made by:
Service New Brunswick Online Payment
https://www.pxw1.snb.ca/snb9000/product.aspx?ProductID=A001PGN0001
E-transfer
payments@arcadianb.ca
(make sure to include your street address in the memo)
By Mail
Send cheque to 6 Municipal Lane Cambridge-Narrows, NB E4C 4P4
At Office
By cheque or cash